An event platform will be built at Clock Tower Quay. This new area will be better suited for holding events and will improve the sector’s visitor experience.
Project highlights:
• Pre-established configurations for event sets
• Relocation and improvement of event power supply utilities
• New trees and vegetation
• Improvements to sight lighting
• New pedestrian traffic routes
• Improvements to surface water drainage
• New water supply points
• New mineralized soil cover
• Universal accessibility considerations
Work will begin in 2021 during the month of September for completion in time for the 2022 summer season.