September 2021 - Summer 2022 | Installation of an Event Platform at Clock Tower Quay | Old Port of Montréal

September 2021 - Summer 2022 | Installation of an Event Platform at Clock Tower Quay

An event platform will be built at Clock Tower Quay. This new area will be better suited for holding events and will improve the sector’s visitor experience. 

Project highlights:

•    Pre-established configurations for event sets 
•    Relocation and improvement of event power supply utilities 
•    New trees and vegetation
•    Improvements to sight lighting 
•    New pedestrian traffic routes
•    Improvements to surface water drainage 
•    New water supply points
•    New mineralized soil cover
•    Universal accessibility considerations

Work will begin in 2021 during the month of September for completion in time for the 2022 summer season.